Ms. Betttencourt's hull is desert dry. There are no water leaks. But the engine presented a different situation recently. There was an air leak somewhere in the fuel system. Diesel engines won't start with air in the fuel system.
According to the log book, I had "cured" this problem five times since I changed the primary and secondary fuel filters on November 22. The work involved checking for leaks in every possible location, tightening stuff and bleeding air from various engine orifices. Each of these fixes resulted in easy starts upon completion, followed by failures to start a few hours later.
Of course, after each "cure" I confidently put the middle cabin back together. This is the point where fruitless fixes get to be really tedious. It is not easy to get to the engine on this boat.
Three cabin deck panels have to come up. The seat must be disconnected and folded back. The forward cabin bulkhead must be hinged forward. Only then may the engine box cover be lifted up and aft to expose the power plant.
Anyway, after lunch yesterday, I started on fix number six -- by opening everything up -- again.
I began at the fuel tank and re-checked every connection. Fuel pickup. Lift pump. Primary filter. Secondary filter. Injection pump. The air was heavy with the smell of diesel fuel. Why is that?
This clue led me to a location outside the engine box where the 10-micron Racor primary fuel filter is mounted. There should not have been diesel fuel in the bilge under that filter. But there was.
While I had checked the fuel line connections to the filter head fitting multiple times, it had never occurred to me that the filter cartridge itself might be leaking. I had apparently failed to fully tighten the cartridge when I installed it in November. It would leak fuel with the engine running, then suck air as the engine cooled after shutdown. Not a lot of air, but enough to make starting problematic.
I hand-tightened the filter cartridge another half turn, bled air from that point through the injector pump and at each of the three injectors. The engine started easily. That was yesterday. It also started easily at 0800 and 1400 today. Maybe fix number 6 is a success.
I will wait until tomorrow and start it at least a couple of more times before I declare victory and reassemble the middle cabin -- yet again.
Meanwhile, cruise plans have become uncertain. My friend Major can't get away in January and other cruising buddies are previously committed.
Maybe I'll just stay home and repaint the dashboard and the middle cabin.
About Ms Bettencourt
Ms Bettencourt is a Swedish built 25-foot trailerable trawler. Her hull was completed in 1971, No. 1117 of about 2500 built. The boat is named for my wife Dia, whose maiden name is Bettencourt.
This little vessel came to me as a gift in 2004. Before then she had been abandoned about 12 years on the Savannah River near Augusta, GA. I have repaired and refitted the boat extensively, and I have cruised her along the East coast of the US, from Cape Lookout, NC, to the Florida Keys. I dream of taking her to Havana some day.
This blog started in 2011 to chronicle the building of a hard top for the boat to replace leaky canvas. Since then the blog has become an Albin-25 boatkeeping and cruising journal.
Saturday, December 29, 2012
Saturday, December 22, 2012
Boatkeeping duties diminish
Sigh! Our 47-foot fiberglass houseboat "Tybee Island" will be leaving our dock for the last time in a couple of weeks. She is going on to a better use as a working vessel for the Savannah Riverkeeper organization.
We had the boat surveyed earlier this month and the inspector scored it in excellent condition. It looks and runs like new. We will miss it.
But a part we won't miss is the continual upkeep required to maintain a vessel in top condition. There was a time when repairs, cleaning and improvements were mostly fun and satisfying activities. But in the last few years, all that became just plain work. Our interests turned away from luxury camping on the water. We were using the boat very little.
For a 25-year-old boat, it is but a short step from disuse to decay.
I expect to be involved for a time in helping the new owners understand the boat's various systems, mechanical needs and maintenance routines. I have also volunteered to teach the Riverkeeper's boatkeeping crew how to safely operate the big boat in the somewhat restricted waters of the Upper Savannah River.
We feel pretty good about finding an excellent new mission for the Tybee Island. But, it's still kind of sad to see her go.
We had the boat surveyed earlier this month and the inspector scored it in excellent condition. It looks and runs like new. We will miss it.
But a part we won't miss is the continual upkeep required to maintain a vessel in top condition. There was a time when repairs, cleaning and improvements were mostly fun and satisfying activities. But in the last few years, all that became just plain work. Our interests turned away from luxury camping on the water. We were using the boat very little.
For a 25-year-old boat, it is but a short step from disuse to decay.
I expect to be involved for a time in helping the new owners understand the boat's various systems, mechanical needs and maintenance routines. I have also volunteered to teach the Riverkeeper's boatkeeping crew how to safely operate the big boat in the somewhat restricted waters of the Upper Savannah River.
We feel pretty good about finding an excellent new mission for the Tybee Island. But, it's still kind of sad to see her go.
Saturday, December 15, 2012
A hard day for the kingfisher
I have been watching this bird, which turns out to be a Belted Kingfisher, much of the morning. I can't get close enough to get a photo, but a picture I found on the Cornell Ornithology Lab website portrays her perfectly.
It is unusually raw, cold and windy here today. But the bird continues to work. Sometimes perched, feathers puffed up, on the weather vane; sometimes on a piling; often skimming inches off the river's surface, always looking for something -- presumably something to eat.
She is noisy too. She has a rattling, chortling, officious kind of call, issued both at rest and in flight. I can see only one of these birds around our dock, so maybe this one is seeking a mate or broadcasting a warning.
Anyway, witnessing this bird's work ethic in action made me feel more than a little guilty. Though the temperature is only in the 40s, cold, wet, windy weather slows me to lethargy.
But bird-driven shame finally propelled me to boat work. I winterized Ms. Bettencourt's pressure water system.
This did not require a lot of effort. Just disconnect and shunt the water heater's in and out water lines and drain the water heater tank.
Then use the pressure water system pump to drain the bow tank. With the tank empty, disconnect the water system feed hose and stick it into a jug of RV antifreeze.
Turn on the pump to distribute the antifreeze through water lines, faucets and the fresh water head plumbing. Turn off the pump and close the drain cock under the sink.
Ms. Bettencourt is now ready for the whatever winter weather happens around here. If the temps get into the mid-20s, I'll hang a light bulb in the engine box. But that is not needed now.
The bird, meanwhile, is still skimming around, nabbing an occasional minnow and making a hell of a racket. According to the bird book, when her day is done she will go home to a burrow in the riverbank.
Though it has been suggested that I make a start on Ms. Bettencourt's new curtains, I'm headed back to the rocking chair by the hearth and the gas logs. I was sitting there earlier, reading a novel, when I happened to look out the window and see that bird.
She's still working. I'm not.
Cornell Ornithology Photo |
She is noisy too. She has a rattling, chortling, officious kind of call, issued both at rest and in flight. I can see only one of these birds around our dock, so maybe this one is seeking a mate or broadcasting a warning.
Anyway, witnessing this bird's work ethic in action made me feel more than a little guilty. Though the temperature is only in the 40s, cold, wet, windy weather slows me to lethargy.
But bird-driven shame finally propelled me to boat work. I winterized Ms. Bettencourt's pressure water system.
This did not require a lot of effort. Just disconnect and shunt the water heater's in and out water lines and drain the water heater tank.
Then use the pressure water system pump to drain the bow tank. With the tank empty, disconnect the water system feed hose and stick it into a jug of RV antifreeze.
Turn on the pump to distribute the antifreeze through water lines, faucets and the fresh water head plumbing. Turn off the pump and close the drain cock under the sink.
Ms. Bettencourt is now ready for the whatever winter weather happens around here. If the temps get into the mid-20s, I'll hang a light bulb in the engine box. But that is not needed now.
The bird, meanwhile, is still skimming around, nabbing an occasional minnow and making a hell of a racket. According to the bird book, when her day is done she will go home to a burrow in the riverbank.
Though it has been suggested that I make a start on Ms. Bettencourt's new curtains, I'm headed back to the rocking chair by the hearth and the gas logs. I was sitting there earlier, reading a novel, when I happened to look out the window and see that bird.
She's still working. I'm not.
Saturday, December 8, 2012
Finessing the port-side docking
I have been spectacularly unsuccessful in multiple attempts to back Ms. Bettencourt into the inside slip at our dock on the Savannah River. I have been searching for a key to achieving this maneuver, but I have consistently failed to coax the boat to go backwards upstream in the direction I desired.
Yesterday, an idea occurred: "Why not come in bow-first and spin her around to a port-side docking under power?"
Right after that, there came a second thought: "It's not like I have never hit a piling before...."
Think about rotating a 25-foot boat 180 degrees under power in a 35-foot rectangle of eddying river with pilings and rocks nearby. I tried anyway. And it worked. I have been practicing and I have gotten reasonably good at it.
Entering the pocket (right) and lining up for a scary-close approach to the riverbank.
A sandy shelf extends out about six feet from the rocks, then the depth drops off to 10 feet. Ms. Bettencourt draws two feet. We did not touch ground on this approach.
Beginning the turn, wary of the piling on the port quarter, with the current trying to move the boat sideways to starboard.
Backing and filling to get lined up.
The bow finally turns. Port quarter smacks a piling, lightly.
This is where I boat-hooked a spring line previously laid out on the dock, leading the line to a cleat on the port quarter. Going astern on the spring line brought the port side to the dock...
...where I was able to step out, complete the mooring and declare victory. (Click to enlarge the photos and see the look of relief on my face).
It was fun figuring out how to do this maneuver. But constantly changing river current and wind, plus the tricky eddy in the pocket between the dock and the rocks make this kind of docking too troublesome and risky for every day use.
And, this is not a 5-second ski boat turn. My approach-to-docking time was about 10 minutes -- hardly a "smartly-done" docking evolution.
Yesterday, an idea occurred: "Why not come in bow-first and spin her around to a port-side docking under power?"
Right after that, there came a second thought: "It's not like I have never hit a piling before...."
Think about rotating a 25-foot boat 180 degrees under power in a 35-foot rectangle of eddying river with pilings and rocks nearby. I tried anyway. And it worked. I have been practicing and I have gotten reasonably good at it.
Entering the pocket (right) and lining up for a scary-close approach to the riverbank.
A sandy shelf extends out about six feet from the rocks, then the depth drops off to 10 feet. Ms. Bettencourt draws two feet. We did not touch ground on this approach.
Beginning the turn, wary of the piling on the port quarter, with the current trying to move the boat sideways to starboard.
Backing and filling to get lined up.
The bow finally turns. Port quarter smacks a piling, lightly.
This is where I boat-hooked a spring line previously laid out on the dock, leading the line to a cleat on the port quarter. Going astern on the spring line brought the port side to the dock...
Dia Bettencourt photos |
...where I was able to step out, complete the mooring and declare victory. (Click to enlarge the photos and see the look of relief on my face).
It was fun figuring out how to do this maneuver. But constantly changing river current and wind, plus the tricky eddy in the pocket between the dock and the rocks make this kind of docking too troublesome and risky for every day use.
And, this is not a 5-second ski boat turn. My approach-to-docking time was about 10 minutes -- hardly a "smartly-done" docking evolution.
Saturday, December 1, 2012
Reeking of diesel; nearly ready to cruise
The job of replacing the fuel gauge sending unit inside Ms. Bettencourt's diesel tank is about 99% finished. The remaining 1% consists of finding and installing a screw I dropped in the bilge.
I abandoned an earlier plan to wait until the tank was dry before beginning the work. Installing the new sender with a nearly full tank wasn't too messy, though it will probably take a few days before I get the diesel smell off my skin. Actually, it may be a week or more before the smell goes away, since I still have to replace the cartridge in the primary fuel filter.
Soon, the boat will be fully serviced and ready for her next cruise.
Meanwhile, I took a day off from Ms. Bettencourt work today and went on Safari.
Safari is the name of Albin-25 #2050, which is owned by my new friend Steve in Greenwood, SC. While Steve's Albin is more than 1,000 production hulls newer than Ms. Bettencourt, it has had a hard life until now. The previous owner had converted it to a ketch rigged motor-sailor before he fell ill and died. The boat was stored and not used for a number of years before Steve acquired it.
Safari is definitely a fixer-upper now, but she came to Steve with a brand-new Yanmar diesel engine and drive train, and most other major systems are in order. He has begun the restoration and I have offered to help.
I was impressed with Steve's boatyard work space. He has erected a 10 x 27 foot canopy over Safari in his back yard.
I think this is a neat idea. This is just the kind of temporary cover I will need when I repaint the topsides and repair a few fiberglass cloth bubbles that have arisen on Ms. Bettencourt's new top.
We have a perfect place for such a temporary structure on a piece of land we own adjacent to our home. Soon, I will be on the hunt for a similar canopy rig.
(One possible complication with this plan is the fact that Ms. Bettencourt sits about 18 inches higher on her trailer than does Safari. I will have to find a work-around for this problem).
But, all that will have to wait until after Ms. Bettencourt's next cruise, which is now moving toward definite dates sometime next month.
My friend Major and I plan to trailer Ms. Bettencourt to Savannah and put her in the water there. Then we'll cruise northward for a few days visiting Beaufort and Charleston, SC. Our plan is to tuck in most nights in comfortable marinas with dockside electricity and restaurants nearby.
Unfortunately, I continue to dither with the new curtains project, so we will be using the curtain rods as towel racks and our towels for privacy curtains yet again.
I abandoned an earlier plan to wait until the tank was dry before beginning the work. Installing the new sender with a nearly full tank wasn't too messy, though it will probably take a few days before I get the diesel smell off my skin. Actually, it may be a week or more before the smell goes away, since I still have to replace the cartridge in the primary fuel filter.
Soon, the boat will be fully serviced and ready for her next cruise.
Meanwhile, I took a day off from Ms. Bettencourt work today and went on Safari.
Safari is the name of Albin-25 #2050, which is owned by my new friend Steve in Greenwood, SC. While Steve's Albin is more than 1,000 production hulls newer than Ms. Bettencourt, it has had a hard life until now. The previous owner had converted it to a ketch rigged motor-sailor before he fell ill and died. The boat was stored and not used for a number of years before Steve acquired it.
Safari is definitely a fixer-upper now, but she came to Steve with a brand-new Yanmar diesel engine and drive train, and most other major systems are in order. He has begun the restoration and I have offered to help.
I was impressed with Steve's boatyard work space. He has erected a 10 x 27 foot canopy over Safari in his back yard.
I think this is a neat idea. This is just the kind of temporary cover I will need when I repaint the topsides and repair a few fiberglass cloth bubbles that have arisen on Ms. Bettencourt's new top.
We have a perfect place for such a temporary structure on a piece of land we own adjacent to our home. Soon, I will be on the hunt for a similar canopy rig.
(One possible complication with this plan is the fact that Ms. Bettencourt sits about 18 inches higher on her trailer than does Safari. I will have to find a work-around for this problem).
But, all that will have to wait until after Ms. Bettencourt's next cruise, which is now moving toward definite dates sometime next month.
My friend Major and I plan to trailer Ms. Bettencourt to Savannah and put her in the water there. Then we'll cruise northward for a few days visiting Beaufort and Charleston, SC. Our plan is to tuck in most nights in comfortable marinas with dockside electricity and restaurants nearby.
Unfortunately, I continue to dither with the new curtains project, so we will be using the curtain rods as towel racks and our towels for privacy curtains yet again.
Subscribe to:
Posts (Atom)