This little vessel came to me as a gift in 2004. Before then she had been abandoned about 12 years on the Savannah River near Augusta, GA. I have repaired and refitted the boat extensively, and I have cruised her along the East coast of the US, from Cape Lookout, NC, to the Florida Keys. I dream of taking her to Havana some day.

This blog started in 2011 to chronicle the building of a hard top for the boat to replace leaky canvas. Since then the blog has become an Albin-25 boatkeeping and cruising journal.


Tuesday, August 14, 2012

Enclosure pictures; additional projects begin

I went to Charleston yesterday and picked up Ms Bettencourt at the canvas shop. I am very happy with the new enclosure. The pilot house area seems more like a room and much less like a tent.


This outside shot (below) shows how little canvas was involved in this "canvas job." I chose black screen material because I think it provides more privacy. The vertical fabric strips at the aft corners cover the panel zippers. The leading edges of these vertical strips are sewn and the trailing edges fasten with velcro. The blue material is heavy duty Sunbrella fabic. The fasteners are turn buttons on the forward edges and across the top of the aft cabin and snaps along the bottom edges.

The top edges of the three panels ride in aluminum tracks, which makes panel removal just a quick zip process.


If you look at the first picture again, you will see that the U-zippers for the clear vinyl are unusually long. The clear on each side  rolls up leaving the panel screen only. Alternatively, the whole panel will roll up and snap providing unobstructed access to and from the pilot house cabin.

Since I don't plan to be climbing in and out the back, I had the rear panel clear zipper installed so the clear rolls down. It is hard to see, but the clear is rolled down in the picture below.

.
The boat is now back under the shed at the Augusta Ports Authority. I gave her a good exterior scrub down this morning and installed a heavier duty trailer winch, which my friend Major provided. I also double-checked the the propeller nuts for tightness and installed a new cotter pin in the end of the shaft. All the running gear seems OK.

I have started building a mount and doing some re-wiring in the pilot house so I can move the VHF radio from under the dash to an overhead location above the steering wheel. Other jobs I hope to finish in the next week include:


  • Install and connect the VHF antenna
  • Three coats of sealer on the teak swim and anchor platforms
  • New teak grab rails inside the pilot house
  • Re-install the windshield wiper motor
  • Paint touch up and
  • Interior cleaning


It is my hope that Ms. Bettencourt will be back in the river at my dock very soon.


Saturday, August 4, 2012

The top project is done!

I trailered Ms. Bettencourt to Charleston yesterday, where I struck a deal to have an enclosure fabricated. This will complete the new top project. So, today, I am officially declaring the top project finished. The new title on this blog should offer a hint about the directions I'll be taking from here.

When I went to Charleston, I was thinking I would be getting new canvas for the boat. That was my first surprise. As it turns out, there is very little canvas involved. There will be three enclosure panels --one each on the port and starboard sides and one across the rear of the pilot house area. The only canvas needed will be just enough to support the fasteners and mounting hardware. In Ms. Bettencourt's case, this will amount to about a two-inch band of blue Sunbrella fabric around the openings on either side and in the back. The rest of the panel assemblies will consist of U-zippered clear vinyl, screens, attachment fasteners and snap straps for securing the panels when they are rolled up or down.

So, the fact that I was getting an "enclosure" instead of new canvas was the first surprise of my Charleston trip. I can handle that. A learning experience, for sure.

My second surprise was almost a heart-stopper. The estimated cost of the materials and labor for this enclosure exceeded my expectations by more than 40 percent. But that was a surprise I just needed to deal with. After a few minutes, I could breathe again and my enclosure enthusiasm re-kindled. We had a handshake on the deal.

The boat with its new enclosure could be ready for pickup as early as next Friday.

So, at last, its cruise planning time. My friend Major requires cooler weather, so our next voyage together will be in October. We are thinking of trailering Ms. Bettencourt to Georgetown, SC. We will use Georgetown as a base for exploration of the Waccamaw and Black Rivers. Both rivers are "blackwater" streams, bordered by deep cypress woods and old and new Southern homes.

I will be on the water with Ms. Bettencourt well before October, however. As soon as I get the boat back from Charleston, I expect to spend a week or so on the hard cleaning up and fitting out for cruise-readiness. I still need to install the VHF antenna, do some electrical wiring and a few other little things. She should be back in the river at my dock before the end of this month.

I am thinking about taking a few days to journey down the Savannah River, about 200 miles to the sea. Dia and her friend Martha have said they could meet me in Savannah, from whence we might continue on to Beaufort, SC.

It appears there will by much to write about as planning for these voyages evolves.


Saturday, July 28, 2012

Status report: On the hard, in the heat


My friend Major and I hauled Ms. Bettencourt on her trailer early Tuesday. She is now tucked under the shed at the Augusta Ports Authority. Surface preparation and paintwork have begun. It is slow going because of the climate. Temps were in the 90s before noon yesterday, and nearing 100 by mid-afternoon. Humidity makes it much worse. Augusta is the only place I know where you can boil and bake at the same time.

I work in short bursts, mostly governed by the position of the sun. The boat and trailer are parked on a north-south axis. I did surface prep and masking on the east (port) side of the boat very early this morning, then moved to the shady (starboard) side for another hour with the scraper and tape. By noon it was too hot to work.

I will be back on the east side with primer, shortly after sunrise tomorrow, then to the other side, and so on. I expect this solar pirouette will persist through two coats of primer with sandings in between, then two topcoats of epoxy enamel, also sanded between coats. Painting has to take place very early mornings when the surfaces to be painted have cooled enough overnight to be within temperature specs for the paint.

Most fortunately, I am not coating the whole vessel. I want to get the underside of the hardtop and the hardtop’s new fir supporting structure primed and painted, and a couple of coats of BilgeKote on the inside of the pilot house. This should be doable, even at my weather constrained rate, in a week or so.

By the way, hauling the boat was not without a little drama. Major, who was at the ramp with the truck and trailer as I motored the Albin upriver, called me on the VHF to report a man in trouble near the Augusta Rowing Club. I found a young man clinging to an overturned one-person rowing shell about 50 yards from the ramp. He seemed happy to see me and said he appreciated the ride to the club dock.

Still on the drama theme, this photo shows what I found after I parked the rig and did a walk around inspection.






That's a big oops! I guess I got in too big of a hurry to get everything back together the last time I had the prop off  for minor repairs.


Re-tightening will be done strictly to Michigan Wheel specs before Ms. Bettencourt goes back in the water.










Finally, I have talked with a canvas guy in Charleston and it is still my plan to trailer Ms. Bettencourt over there the week of August 6. If I get a design and a price quote I like for a canvas enclosure, I'll just leave her in Charleston to get the work done.

Sunday, July 22, 2012

Crazed but still functional ...

... Is there a remedy?

I have been an Albin-25 aficinado since 2003 when my neighbor gave me the wreck of a boat which has become the present day Ms. Bettencourt. Over this time I have inspected perhaps more than two dozen other Albins searching for ideas I might want to incorporate in my vessel.

One unusual feature that I noticed in all these boats, including my own, was a badly cracked and crazed finish on the dashboards. I also saw some strange (to me) remediation techniques employed by owners. I saw a couple of instances where people had applied sticky-backed vinyl wallpaper over the dash and around the helms. In another case, an owner had glued stained and varnished plywood panels over flat spots in the dash and painted around them. Yet another person had deployed a kind of table cloth, weighted down across the top under the windshield, to conceal his flawed finish.

In Ms. Bettencourt's case, I had pretty much a blank slate to work with when I got around to tackling this problem in 2005. The dash was a disaster.




This is where the dashboard project started. Please recall that the boat had been abandoned on the water for 12 years before it came to me.
















So I just tore everything out and started over. I believe if you click on the picture and look closely you will see vestigial mud dauber nests in the glove box and on the tangle of wire hanging out from under the dashboard.








I sanded the dash and surrounding area thoroughly and filled a lot of dings and holes. Next came two coats of Pettit Easypoxy undercoater, which seemed to fill the network of cracks all over the dash surface. After sanding yet again, I followed this up with two coats of Pettit Easypoxy topcoat.

At the time, I though the result looked pretty good.









Unfortunately, the beauty was transitory. Here's what it looks like today. Again, if you look closely, you should be able see the underlying crazing and cracking across the entire surface. Obviously, the so-called "high build primer" topped with one-part epoxy paint did not hold up.





It is beginning to look like my Winter 2012-2013 Albin project will be re-doing the dashboard (again). Given my good experience with Interlux two-part epoxy undercoat and their Perfection topcoat, I am beginning to think that these will be my products for this job. I will be calling Interlux Tech Support sometime soon to get their ideas, which I am sure will start with "...remove all of the current one-part epoxy paint job." Maybe they will have another magic product that will peel the stuff off easily. More likely, the answer will be elbow grease and a lot of sandpaper.

Any better ideas?

I would be very grateful for any advice on this dashboard project. Has anyone used a product they can recommend? Is there a better way to do the job? Please respond using the comment box below.

Back at the jobsite...

I have been burning through masking tape, preparing the interior of the pilot house for paint. And, we are still on schedule to haul the boat and finish painting the hardtop surround and underside next week. As soon as that work is finished, the plan is to haul the boat directly to a canvas shop in Charleston to have the hardtop enclosure designed and fabricated. More about that later.


Sunday, July 15, 2012

Back to work!

My friend Major and I will be hauling Ms. Bettencourt on her trailer July 23 or 24 for a 10 day stay under the shed at the Augusta Ports Authority warehouse. Here's the work I plan to finish during that period:


  • Inside pilot house

            Mask around windshield, side windows, dashboard
            Clean surfaces
            Fill and fair holes left from old canvas fasteners
            Remove, refinish teak grab rails
            Repaint with white Interlux Bilgekote
            Reinstall teak grab rails

  • Interior underside of hardtop

            1 coat of Interlux Epoxy PrimeKote primer
            1 coat Interlux PreKote primer on rafters and stringers
             Sand and wipe down with solvent
            2 coats Interlux Brightside including rafters and stringers

  • Exterior underside of hardtop

            Mask around windshield and side windows
Touch up hardtop perimeter with Interlux Epoxy PrimeKote
Surface prep, exterior rafters and stringers
1 coat Interlux PreKote primer on rafters and stringers
Sand and wipe down with solvent
2 coats Interlux Brightside including rafters and stringers

  • Reinstall windshield wiper motor
  •  Install VHF antenna
  • Check zincs and cutless bearing
  • Repair dings and scratches on the hull


I am working to identify a canvas designer/installer now and it is my hope that when the above list is finished, we will trailer the boat directly to the canvas shop.






After that...


          ...Cruise time!

Saturday, June 30, 2012

The battle starts--bodies everywhere

I checked the boat ramp about 7:30 this morning and the parking lot was full of vehicles with bicycle racks on them. Milling around were many buff-looking people wearing wet suits and running shoes, most of whom seemed to be anticipating something dreadful. Apparently there is an iron man event going on. Hauling the boat so I can paint the underside of the new top in the shade is out of the question -- at least for today. 


So I decided to attack the boat spiders. I use fabric softener strips such as Bounce as a repellent  in enclosed spaces -- the cabins, bilges and stowage areas. It works great. But Ms. Bettencourt's outside areas were swarming with arachnids. They were inhabiting the undersides of the rub rails, The outside eaves around the top, under the swim and anchor platforms and around the rafters inside the top.This is not good. 


I did some research and it turns out that boat spiders are not problems for power boaters alone. A search of the topic on power, sail, houseboating and wooden boat forums revealed many remedies. Here's a sampling:

  • Donate the boat to charity.
  • Cover the boat with landscape shade cloth
  • No-pest strips
  • Electronic anti spider devices
  • Aerosol foggers
  • Roach spray
  • Encourage large wasp nests
  • Acquire one really big spider
  • A medium-sized cat
  • Spider baits
  • Lemon furniture polish

Others that I particularly liked included a witchcraft spell that involved vinegar (this one came from a wooden boat person who had forgotten everything about the spell but the vinegar). And there was another guy posting on a Chris Craft forum who said he was attacking his spiders with a spear gun. 


Then there were these instructions:  The boat owner is to place an open bottle of Jack Daniels whisky outside the cabin so the spiders are "...drawn out of the cabin, either falling overboard drunk or running around the deck wearing women's underwear on their little spider heads. This immediately gives their position away at which point they can be easily eliminated, providing the captain has not been into the Jack himself."


Surprisingly, there seems to be a fairly large pro-spider faction among boaters. Many of these spider advocates point out that these little creatures eat mosquitoes and flies. I have some sympathy for this position, but Ms. Bettencourt's outside spiders have pushed me into the opposite camp. They started leaving black splats all over everything, including the new top. I went to the home store, bought a gallon of  Home Defense insecticide and dumped it in a pump sprayer. I sprayed every place I thought they could hide. Results were rapid and satisfying.








A survivor on the dashboard. I will be back for her tomorrow.

















This one was not so lucky. She and many others will be collected with the shop vac.









A relentless anti-spider campaign has begun. Tonight, when it gets cooler, I will scrub away the black splats. Then I'll vacuum up the sick and the dead and as many egg sacs as I can find. Tomorrow morning, Ms Bettencourt will see another perfect squall of spider spray.


This will continue for as long as necessary.


No, I am not making excuses for postponing the paint work. You can't paint with spiders hanging all over the place. And besides, it's too hot. There are too many swimmers with bicycles. The water level is too low. It is not patriotic to paint on the 4th of July weekend.





Monday, June 25, 2012

Everything is s-l-o-w-i-n-g down


Here's an update on the status of boat stuff that needs to be done before Ms. Bettencourt can go cruising again.


  • The boat must be hauled so I can finish painting the new hardtop's underside and framework. I want to get this done before starting on the canvas. Once on the hard, work days will probably be short because the Georgia summer has arrived with a vengeance and the coatings we will be using are fancy epoxy concoctions that have some definite application temperature boundaries.

  • I have found a place to park the boat under a shed on the west side of the warehouse at the Augusta Ports Authority. This means we will probably be able to paint in the shade at least in the mornings. The haulout is scheduled for July 1 or 2.

  • Canvas acquisition is in the preliminary ideas stage. The old canvas has been sold and will be on its way to another Albin-25 in upstate New York in August. I am now looking for the right craftsmen to make a new suit of canvas to work with Ms. Bettencourt's's new top.

    I do not think I will find the skills I need locally. There are a couple of possibilities in Charleston.


    The canvas should not be a big job-- I calculate about 45 square feet-- but it will be complicated. I would like to have screens and clear panes. There must be easy in and out access. A design that allows fast and easy canvas deployment and removal is also desired.

    I have put out calls for canvas ideas through the various boating channels and a few thoughts and leads have surfaced.  Please use the comments box below to post any ideas, experiences or examples of good canvas design that you might have to share.  

  • Major interior and exterior paint work will be postponed until fall.

  • It is my goal to be on the way to a cruise, likely somewhere in Florida, by the end of August.

Robert E. Lee

Tomorrow, I am off to a History Department program on the American Civil War at the University of North Carolina in Chapel Hill. I am looking forward to hearing Prof. Freddie Kiger talk about "Lee's First Campaign--The Seven Days." 


The rest of the week will be spent exploring some battlefields in Virginia with a friend from Chapel Hill. 


While we're in Virginia, temperatures back in Augusta are expected to peg in the 100s. So it seems to me that now is a good time to step back from boat work for a time to pursue other interests in cooler climes.

The next installment of this chronicle will report on Albin painting work and canvas progress, plus, perhaps, some early cruise planning ideas.